And scroll down to see more details on each with installation hints and tips below.
Nail spacing for roof sheathing.
Click to expand contents.
Ventilate the roof according to current building codes step 3.
Use a 10d box nail to gauge 1 8 inch spacing between panels.
How many nails per board in roof sheathing.
Method for maintaining a continuous load path at the roof ridge by nailing roof sheathing.
Holes drilled in roof sheathing for ventilation roof diaphragm action is maintained.
Nail spacing is recommended 4 inches on center maximum.
Fasten panels with a minimum of 8d common 0 131 inch x 2 1 2 inches nails spaced at a maximum of 6 inches on center at supported panel ends and edges.
Check the nailing surface is level step 2.
Spacer type panel edge clips may also be used for roof sheathing applications.
Roof truss spacing will vary on the structure s construction.
To assure best performance follow these panel spacing and nailing recommendations for apa rated sheathing apa rated sturd i floor and apa rated siding.
For vaulted or cathedral roof construction provide free ventilation path from eaves to ridge between all rafters.
The type of nails you ll need to use during the sheathing process depends on the roof material thickness.
There are typically 12 16 or.
Unless otherwise indi cated by the panel manufacturer leave a 1 8 inch gap about the width of a 16d common nail between panel edges to allow for expansion.
Boards for the floor caulking gun for 30 ounce tubes of adhesive afg 01 rated adhesive in 30 ounce tubes cleaning supplies such as rags and paint thinner fan and or light utility knife and long screwdriver to open tubes safety items including glasses or goggles and a bicycle helmet or hardhat.
Structural sheathing is typically cut slightly short of 48 inches by 96 inches to allow for this expansion gap look for a label that says sized for spacing.